Colonel Rahman playground, a huge field on the south side of the college, was paved by some heavy engineering vehicles (dosage, dumpers, excavators, tank transporter etc.) which were brought from the Cantonment of Jessore. The arrival of such heavy vehicles in the college was also a rare event and it added a huge excitement and pride to the college. They worked for two weeks relentlessly and removed nearly 100 trees along with extensive development work of the land and college boundaries. Alongside the college boundaries, a long petrol road was constructed which brought a revolution to the total security of the college. Later on, a Roller from the Roads and Highway joined the construction work and finished it with success.